1.6 KiB
1.6 KiB
| title | status | lifecycle_classification | owner | created | last_reviewed | core_promotion_status | route |
|---|---|---|---|---|---|---|---|
| CTO Case Provider Build Issues | draft | sot | jp | 2026-05-31 | 2026-05-31 | not-promoted | cto |
CTO Case Provider Build Issues
Local planning SOT only. Not a Core Protocol. Not active Core authority.
CTO-WORK-015 - Durable Case Provider Build PRD
Status: validated.
Register the provider build route that separates source discovery from executable admission.
Acceptance:
- Records WorkOS Case source
https://github.com/workos/case.git. - Records pinned commit
7959ac917cdeb0983b4aaa20bb9f42021747fed8. - Records local build dependency status: Node
v20.19.5present, Bun missing. - Requires
bun run build:binaryto producedist/cabefore real Stage 2 can pass. - Requires SHA-256 digest for admitted
dist/ca. - Keeps
/tmpclone as discovery evidence only.
CTO-WORK-016 - Real Case Provider Stage 2 Run
Status: blocked.
Build or supply a durable admitted WorkOS Case ca executable, then run the existing Hermes CTO Stage 2 artificial fixture through real Case.
Acceptance:
- Bun is available, or a durable admitted
dist/capath is supplied with source pin and digest. CTO_HARNESS_CASE_BINpoints to the admittedcaexecutable.- Stage 2 invokes
ca run --task <task-file> --mode unattended. - Real Case execution produces a Stage 2 pass report through the Harness Evidence Interface.
- Provider-unavailable fail-closed behavior remains tested.
- Fake remains the default validation lane.
- No Target Repository path is inspected or copied.
Blocked by:
- Missing local
bunexecutable, unless a prebuilt admitteddist/cais supplied.